Skip to main content
Traffic Wales information line 0300 123 1213
The Welsh Government’s traffic information service for motorways and trunk roads in Wales

Mold Bypass A494 Nercwys Road bridge – Renewal of bridge movement joint - 20:00 to 06.00 24/05/2021 to 28/05/2021

Share

Where and Why?

Works are to be carried at the bridge over Nercwys Road near to the Bromfield roundabout. The bridge movement joint at the West end of the bridge is worn out and must be replaced.

Diversions and Safety Measures

The A494 is to be closed in both directions between Bromfield roundabout at the A494/B5444 junction and Gwernymynydd roundabout at the A494/A5119 junction. The road will be closed for a series of  over-night closures from 20.00 on Monday 24th May to Friday 28th May (06.00)

Traffic will be diverted via the B5444/A5119 Ruthin Road through Mold.

The works are being carried out during over-night closures when traffic flows are lower to minimise disruption.

Enquiries

For further information, please contact Traffic Wales on 0300 123 1213 or via Twitter @TrafficWalesN


Call the Traffic Wales information line
0300 123 1213
Contact us