Start Date: 22/03/24 | End Date: April 2024
Work to carry out essential Maintenance works to the underside of the A48 River Neath and Briton Ferry Dock Viaduct.
Works will include drainage repairs, netting maintenance, and structural inspections to address any safety risks at the structure.
The work will be carried out during the day Monday to Friday, with minimal disruption to the local area.
Two-way lights will be required to undertake works above the access roads near the Neath Port Talbot recycling yard as required, the road will be open at all times for through traffic and access to the recycling yard will not be restricted.
No diversions will be in place.